Commercial Ice Machine Pre-Order Site Checklist

On this page

Introduction

Before ordering, measure the tightest point on the delivery route and the clear space where the machine will sit. Mark the space needed to open the bin door or lid and where staff will stand to scoop ice. Ask the installer to check your sketch against the drawing for the exact machine or head-and-bin combination on the quote.

Open the one-page site checklist to record those measurements. If you are still choosing a model, fill in the site details now and leave the equipment and connection requirements for the supplier’s drawing.

Illustration of two people reviewing the space beside a commercial ice machine

1. Follow the machine from delivery to its final position

Start where the delivery will be unloaded. Walk the route to the installation point. Find the tightest doorway, lowest overhead obstruction and turn with the least room to manoeuvre. Record where each limit occurs. Measure clear openings with doors in their usable position, and include any handles, frames, thresholds or fixed equipment that narrow the route. Note lifts, steps and changes in floor level.

Give the supplier the measurements and a photo or sketch of the tightest turn. Ask for the packaged dimensions and weights of the items as they will be shipped. If the delivery plan relies on unpacking earlier or moving the head and bin separately, have the supplier and delivery team confirm that the proposed equipment can be handled that way. A narrow door and an awkward turn need separate checks.

2. Draw the space the installed equipment will occupy

Mark the equipment position on a sketch. Measure the clear width, depth and height and show nearby obstructions such as a worktop, wall or shelf. For a modular proposal, identify the exact head and bin in the quote. Ask for a drawing of the complete combination, including the base or legs where fitted. A head-only drawing leaves the installed height unresolved.

Then mark where doors, lids or removable panels will move. For a recessed installation, show what will be on either side and above the machine once the rest of the kitchen is in place. Have the installer compare the sketch with the manufacturer’s drawing for the quoted configuration, including the specified ventilation and access space.

3. Check the connections and the route the ice will take

Put the water supply, available drainage point and electrical connection location on the same sketch. Record their positions relative to the proposed unit. Give the installer the manufacturer’s connection and installation documents for the exact version on the quote. The installer can then confirm the site supply, the proposed water and drainage routes and any work that must be completed before delivery. Where the manufacturer specifies separate connections, identify each one on the sketch.

Walk through a normal ice transfer as well. Show where an operator will stand, which container they will use and where the ice goes next. A bin lid may open fully on paper, yet the operator may still lack room to stand beside it with the container. On a seafood display project, mark the route to the display and the space needed to set down a refill container.

For the electrical handoff, use the voltage, frequency and phase checklist to match the installer’s site record to the supplier’s quoted version.

For inlet water and a proposed filter, use the water and filtration guide to organize the information your installer will need.

4. Leave a way to service the machine

Show the proposed access to the machine’s service panels and any separately installed filter or other serviceable item on the quote. Ask the installer to check that those points remain reachable after counters, shelves and other equipment are fitted. If routine access relies on moving an adjacent unit, record that dependency and agree who will resolve it before the order goes ahead.

Copy this one-page site checklist

Use one copy per site and proposed configuration. Enter dimensions with units, mark any unconfirmed item as Pending, and give it an owner. Reference the photo, sketch or drawing revision where the next person can find it.

CheckSite team recordsSupplier or installer confirms
Project and versionSite or project reference, survey date and site contactQuote revision, exact proposed model and configuration, head and bin IDs where applicable
Delivery routeUnloading point, narrowest clear openings, tightest turn, lift or step constraintsSupplier provides packaged sizes and weights. Delivery team verifies the route and any planned unpacking
Installed positionClear width, depth and height, adjacent obstructions, door and lid swingSupplier provides the complete drawing. Installer checks the proposed assembly and required clearance
Water and drainageConnection and drain locations, heights or distances on the sketchSupplier identifies connection requirements. Installer confirms the planned routes and site work
Power and ventilationVerified site supply, connection location, surrounding walls or heat sourcesSupplier identifies the electrical and ventilation requirements for the quoted version. Installer checks site compatibility
Use and service accessOperator position, scoop or container access, refill route and obstaclesSupplier identifies access points. Installer checks service access in the finished layout
Open items and responsibilityMissing measurement or decision, owner and due dateRecord who will close each item and which work is included in the quote

Copy one line for each check: [measurement or drawing reference] — [confirmed or pending] — [responsible person] — [due date]. Add the unit to every measurement.

Before issuing the purchase order, check that the site record and quote refer to the same configuration. Treat any open item that could change delivery, fit, connections or safe service access as a hold point for that configuration. If the supplier substitutes a model, bin or electrical version, reopen the affected checks before approving the change.

If two suppliers include different bins, filters or installation work, carry the site record into the quotation comparison guide so those differences stay visible. For an ICES proposal, enter your site measurements and any outstanding checks in the inquiry form. Add the quote reference if you already have one. Use WhatsApp at the top of the form to share a photo or drawing.

Check the Handover Before the First Shift

At handover, record the serial number, the applicable bin reference and the final layout revision. Ask the installer which checks are complete. Have the operator walk the ice route with the container used during a shift.

For example, if the installed position moves to clear a pipe, mark the change on the final drawing. Ask the installer to recheck the affected access and connections against the applicable instructions. Record the operator’s pickup route separately. If the first shift later reports a problem, use the shipping and site checks guide to organize the factory and site records.